Cut an Underground Cable? Stop Digging — Then Call Us, 24/7

The auger jolted, the breaker tripped, and half the house went dark — or worse, the digger's bucket is sitting on something that's still live. A severed underground power cable is both an outage and a serious hazard. High Demand Electrical repairs cut underground consumer mains 24/7 across Sydney, from make-safe to reconnection.

Over 300 - 5 star reviews!

Need urgent help now?

 Call us for priority dispatch

0402 559 777

Get Your Free Instant Quote Now

We promise to get back to you within 10 minutes

Max file size 10MB.
Uploading...
fileuploaded.jpg
Upload failed. Max size for files is 10 MB.
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.
Power Outages

Just Hit a Cable? Do This Now

The minutes after a cable strike are when people get hurt — usually by going back for another look. Follow this order, then call 0402 559 777.

  • Step away from the excavation and keep everyone else away — the cut ends may still be live even if power tripped.
  • Don't touch the cable, the tool that hit it, or the machine — an excavator in contact with a live cable can be energised.
  • If someone has received a shock, call 000 first.
  • Leave the hole open and undisturbed — burying the evidence makes repair slower and more expensive.
Emergency tree fell down
Power Outages

From Strike to Supply Restored

Cable strike repairs are urgent, regulated and entirely Level 2 — here's how we run them.

counter_1

Emergency isolation

The damaged run is de-energised and proven dead under our authorisation — making the site safe for everyone including your contractors.

counter_2

Damage assessment

Severed or crushed sections identified — strikes often damage more cable than the visible cut, so we test both directions.

counter_3

Proper jointing or section replacement

Rated underground joints installed — or the damaged section replaced where crushing extends beyond the strike point.

counter_4

Compliant reinstatement

Conduit, marker tape and correct depth on the repaired run — so the next fence post finds tape, not cable.

counter_5

Test and reconnect

Insulation testing to standard, then supply restored under our Level 2 authorisation with certification.

Power Outages

How Cables Get Cut

The same tools appear in these stories every week — if you're about to use one, read the last card first.

article

Fence Post Augers

The number one culprit — fast, deep and blind. Old cable runs cross fence lines more often than anyone expects.

switch

Excavators and Mini-Diggers

Trenching for plumbing, pools and footings finds cables that were never marked — or never laid where the plan says.

storm

Stump Grinders and Tree Work

Roots and cables share the same ground — grinding a stump over a cable run ends predictably.

cable

Landscaping and Irrigation Work

Shallow old runs — sometimes barely a spade deep — meet garden renovations constantly.

warning

Driveway and Concreting Works

Formwork pegs and compaction damage cable that's then entombed — faults surface months later.

power

Prevention: Dial Before You Dig

Free national service (call 1100 or byda.com.au) maps registered services — and we can trace private runs the plans don't show before your project starts.

Power pole underground
Power Outages

What the Repair Includes

One crew from hazard to handover — with the paperwork your builder, insurer or contractor's insurer will ask for.

  • 24/7 emergency isolation and site make-safe
  • Testing in both directions to find all strike damage
  • Rated underground jointing or section replacement
  • Conduit, marker tape and depth-compliant reinstatement
  • Insulation testing, certification and Level 2 reconnection
  • Incident documentation for insurance and liability claims

No Site Inspection Fee for Level 2 Work

money_off
We don't charge just to
assess the job
shield
Free site inspection for
all Level 2 work only
rainy
Storm damage? We've
got you covered
Need an emergency electrician for a power outage in Sydney?
Your Level 2 site inspection is completely free — get expert advice before committing.
license
LICENSED EXPERTS
Level 2 Accredited
bolt
24/7 EMERGENCY SUPPORT
365 days a year
schedule
FAST RESPONSE
When you need it most
Why High Demand Electrical

Why Call High Demand Electrical

Cable strikes stall building projects and leave homes dark — speed and authority to reconnect are what get things moving again.

safety_check

Level 2 ASP Accredited

Underground consumer mains repairs and reconnection are Level 2-only work — ours end to end (Class 2a, 2b, 2c).

schedule

Genuine 24/7 Response

Strikes happen on weekend projects — and we answer on weekends, holidays and nights alike.

attach_money

Upfront, Transparent Pricing

Repair scope and options quoted before work proceeds — free Level 2 site inspection included.

star_rate

300+ Five-Star Reviews

Builders and homeowners rate us five stars for unsticking stalled sites fast.

computer

ISO Triple Certified

ISO 9001, 14001 and 45001 — excavation-adjacent work run to certified safety procedures.

build

Fixed Right the First Time

Jointed, tested and reinstated to standard — with marker tape so it never happens twice.

Service Areas

Do We Service Your Area?

Type your suburb below to check instantly. We're across Greater Sydney.

    Can't find your suburb? Give us a call — we may still be able to help.
    Call 0402 559 777
    Frequently Asked Questions

    FAQs

    I cut a power cable while digging. Is it still dangerous if the power tripped?

    Treat it as live regardless. Protection may have tripped one side while the other end remains energised, damaged cables can re-energise, and wet ground conducts. Keep everyone away from the excavation and the machine, and call 0402 559 777 — we isolate and prove it dead first, always.

    Who pays for a cut cable — me, my contractor, or insurance?

    If a contractor cut it, their public liability insurance typically covers the repair; if it was your own project, home insurance may contribute depending on policy. Either way our incident documentation — photos, cause report, itemised repair quote — supports whichever claim applies. The repair itself can't wait for the paperwork; make-safe comes first.

    How long does it take to repair a severed underground cable?

    Once located and excavated — which your strike has usually done for us — most joints are completed, tested and reconnected the same visit. Crushed runs needing section replacement can take longer; you'll get an honest timeline and upfront quote on arrival.

    The Digging's Done. Let's Get the Power Back.

    Cut underground cables repaired, tested and reconnected by Level 2 crews — 24/7 across Sydney, upfront pricing, incident reports included. Call 0402 559 777.

    0402 559 777

    Fully Licensed

    Our Energy Providers

    Authorised by Sydney's major networks

    Our Partners

    Powering Your Needs with Expertise

    If you’re looking for a reliable, experienced, and prompt electrician, look no further than High Demand Electrical. We cater to all your electrical needs, from routine maintenance to emergency repairs and complete system installations. Our skilled team is committed to providing professional service that ensures your electrical systems run smoothly. Whether it's a small task or a large project, give us a call today. Let us meet all your electrical demands with the quality and reliability you deserve.