Free Electrical Tools & Calculators
.webp)
Free Tools. Zero Obligation.
EV & Backup Power
EV Charger Load Calculator
Generator Load Calculator
Technical & Compliance Calculators
Cable Size & Voltage Drop Calculator
Maximum Demand Calculator
Pole & Strut Size Calculator
Ready for the real thing, not just an estimate?
FAQs
Explore our frequently asked questions to learn more about the specialised services provided by our certified Level 2 Electricians.
Yes — every calculator on this page is completely free, with no sign-up and no ads. They're built by our Level 2 ASP team so you can plan a job or understand a defect notice before you call anyone.
Each tool applies the relevant Australian standard — AS/NZS 3000 for maximum demand, AS/NZS 3008 for cable sizing, or the SIRNSW tables for poles and struts — so results are a reliable starting point. They're estimates for planning purposes, not a certified design.
Yes. Every calculator here is an estimating and learning tool, not a replacement for a licensed assessment. Consumer mains, supply-side and metering work must be carried out by a Level 2 ASP electrician in NSW — send us your result and we'll confirm it on-site.
Start with the EV Charger Load Calculator to estimate charging time and load. If you want to see how it affects your whole property, run the Maximum Demand Calculator next — an EV charger over 10A is counted at 100% of its rating with no diversity.
It depends on what you want to keep running. Add up the running watts of your essential appliances, allow for the largest start-up surge, then add around 20% headroom. The Generator Load Calculator does this for you and suggests a Generac size — our team confirms it on-site.
Two checks decide it: the cable must carry your load current without overheating, and the voltage drop over the run must stay within limits. Whichever check demands the bigger cable wins — the Cable Size Calculator shows both side by side for every candidate size.
Maximum demand is the highest current your installation is expected to draw at any one time, after diversity is applied. It sets the size of your consumer mains, main switch and supply — the Maximum Demand Calculator works it out to AS/NZS 3000 Table C1 with the full working shown.
It depends on your service size and the span of the line. The Pole & Strut Size Calculator reads the SIRNSW sizing tables to give you the required strength rating, then converts it into real steel pole, timber post and angle iron strut sizes in about ten seconds.
Not always. Three-phase is usually considered when you want faster EV charging, run larger equipment like ducted air conditioning, or your maximum demand exceeds what single-phase can deliver. A licensed electrician can confirm what your switchboard and supply can support.
Powering Your Needs with Expertise
If you’re looking for a reliable, experienced, and prompt electrician, look no further than High Demand Electrical. We cater to all your electrical needs, from routine maintenance to emergency repairs and complete system installations. Our skilled team is committed to providing professional service that ensures your electrical systems run smoothly. Whether it's a small task or a large project, give us a call today. Let us meet all your electrical demands with the quality and reliability you deserve.