What Are the Electrical Requirements for a Ghost Kitchen in Sydney?

Ghost and cloud kitchens pack several independent kitchen stations into one building, so the switchboard has to handle genuine maximum demand, dedicated circuits and RCD protection for multiple operators at once. Here is what a Sydney ghost kitchen facility actually needs electrically, and why most of it is Level 2 ASP work.

What are the electrical requirements for a ghost kitchen or cloud kitchen in Sydney? A ghost kitchen puts several independent delivery only operators into one building, each running their own cooking station, so the switchboard has to be sized for genuine maximum demand rather than one restaurant's load. Every station needs dedicated circuits so one operator's fault cannot take out another tenant's power, RCD protection suited to a wash down environment, and in most cases three phase power for shared or individual cooking equipment.

⚡ Quick Answers: Ghost Kitchen Electrical Requirements

  • Can one switchboard really run several kitchen stations at once? Yes, but only when maximum demand is calculated with proper diversity across every station, not just the sum of each tenant's connected load.
  • Does every tenant need their own circuits? Yes. Dedicated circuits per station mean one operator's overloaded fryer or faulty appliance trips their own breaker, not the whole building.
  • Do ghost kitchens need three phase power? Most do, once you add up combi ovens, induction cooktops, blast chillers and walk in refrigeration across several stations at once.
  • What RCD protection applies in a shared commercial kitchen? AS/NZS 3000 requires 30 mA RCD protection on non domestic final subcircuits supplying sockets, lighting and hand held equipment, which covers nearly everything in a wash down kitchen.
  • Do extended trading hours change the electrical design? Yes. Later finishes mean exhaust and emergency lighting circuits, security systems and delivery platform technology all need to run safely well past normal restaurant hours.

1. What makes a ghost kitchen's electrical load different

A standalone restaurant has one kitchen, one set of equipment and a known peak. A ghost or cloud kitchen facility fits several unrelated food brands into one shell, each running their own commercial kitchen station, often cooking at the exact same time during a Friday night delivery rush. That coincidence of peak loads is the whole electrical design problem.

Get the sizing wrong and the building either trips under genuine peak demand or, more commonly, gets built with an oversized supply that costs the landlord far more than it needed to. Either way, this is a job for proper load calculation, not a guess based on the floor plan.

2. Calculating maximum demand when several stations cook at once

AS/NZS 3000 sets out several accepted ways to determine maximum demand for consumer mains and submains, including calculation using load groups, assessment, measurement and limitation. For a multi tenant kitchen facility, the calculation method usually combines an energy demand allowance per square metre for each station's floor area with a diversity factor applied once the stations are combined onto shared mains.

The standard's alternative switchboard diversity method is particularly useful here: once you know the number of downstream circuit protection devices feeding the various stations, a diversity factor between 0.6 and 0.9 can be applied to the arithmetic sum of their ratings, because not every piece of equipment in every station runs flat out simultaneously. A facility with six or more tenant subboards, for example, can reasonably apply a lower diversity factor than one with just two or three, because the statistical chance of every single station peaking in the same five minute window keeps dropping as more tenants are added.

This is why a proper maximum demand calculation under AS/NZS 3000 matters so much more in a ghost kitchen than in a single tenancy. Underestimate it and the building nuisance trips during peak delivery windows. Overestimate it and the landlord pays for consumer mains, a transformer allocation or a three phase upgrade that was never actually needed.

3. Dedicated circuits per tenant so one fault does not take everyone down

In a shared building, the single worst electrical outcome is one operator's faulty appliance or overloaded circuit taking the whole facility offline during a Saturday dinner rush. The fix is straightforward in principle: every tenant gets their own dedicated circuits back to their own distribution board, fed from a correctly sized tenant submain rather than sharing final subcircuits with the kitchen next door.

In practice this means each station's fryers, combi ovens, extraction fans and refrigeration get their own circuit breakers on their own board, clearly labelled with that tenant's name or unit number. A fault, overload or RCD trip in Tenant A's kitchen then isolates only Tenant A, while Tenant B keeps cooking and taking orders without interruption. This is the single biggest electrical difference between a standalone restaurant fitout and a true multi tenant ghost kitchen, and it is the detail that gets missed when a facility is retrofitted cheaply rather than designed properly from the switchboard down.

A well planned commercial electrical fitout builds this tenant separation in from day one, rather than bolting it on after the first dispute between operators over who tripped whose power. It is a different problem to a single operator's commercial kitchen circuit overload, where the fix is sizing one kitchen's own circuits correctly rather than isolating several independent kitchens from each other.

4. Three phase power for shared and individual cooking equipment

Commercial combi ovens, induction cooktop batteries, blast chillers and larger extraction systems are almost always three phase equipment, and a facility running several of them across different stations at once needs a supply built for that from the start. Some ghost kitchen buildings run a shared three phase supply into the main switchboard and then split single phase circuits out to smaller stations, while larger anchor tenants may need their own dedicated three phase submain.

Whether the right move is a shared three phase supply or individual tenant allocations depends on the mix of equipment and how the landlord wants to meter and bill each operator. A single phase to three phase power upgrade is common when an existing building is converted from a single restaurant into a multi tenant kitchen facility, since the original supply was almost never sized for several commercial kitchens running independently.

5. RCD protection in a shared wash down kitchen environment

Every commercial kitchen is a wash down environment, and a ghost kitchen multiplies that by however many stations share the building. AS/NZS 3000 requires 30 mA RCD protection on non domestic final subcircuits rated up to 32 amps that supply socket outlets, lighting and hand held or direct connected equipment, which in a working kitchen is essentially everything except a narrow set of exempted fixed appliance circuits.

Damp and wash down areas also carry extra obligations under the standard around equipment rating and water ingress protection, separate from the RCD requirement itself. Our dedicated guide to wash down area electrical rules covers how that zone is measured and what IP rated equipment is actually required inside it. In a shared facility, every tenant's station needs this protection applied individually at their own board, not assumed to be covered by whatever the building's original fitout included.

6. Switchboard metering and isolation for every tenant

SIRNSW treats groups of small shops, shopping malls and factory units sharing one building as multiple installations, and requires each tenant's service equipment and metering to be clearly separated and identifiable. A ghost kitchen facility is no different: each operator needs their own isolation device at the switchboard, sealable where whole current metering applies, so their supply can be shut off independently for maintenance, a fault or a dispute without touching anyone else's kitchen.

This usually means individual sub metering so each tenant is billed for their own actual consumption rather than a flat allocation, which matters a great deal once you have several kitchens running extraction, refrigeration and ovens on very different schedules. A smart meter upgrade at the tenant level gives the landlord accurate, auditable consumption data for every operator in the building, which also makes it far easier to bill fairly and spot a tenant whose load has crept beyond what their circuits were designed for.

The three phase load across the whole building also needs to stay reasonably balanced between the three active phases rather than loading one leg heavily while the others sit idle, which is a standard distributor requirement that becomes genuinely difficult to manage without planning when several independent tenants are adding and swapping equipment over time.

7. Extended trading hours and the loads people forget

Delivery only kitchens frequently trade later than a typical dine in restaurant, chasing the dinner and late night delivery windows long after neighbouring businesses have closed. That changes the electrical picture in ways that are easy to miss at design stage. Extraction and ventilation need to keep running safely for longer shifts, emergency and egress lighting circuits need to be genuinely independent of each station's own lighting so a tripped kitchen circuit never plunges a corridor into darkness, and security systems, CCTV and delivery platform tablets all need reliable, surge protected power running well into the night.

A sudden voltage spike from the street, a storm, or even a neighbouring tenant's equipment switching off hard can damage sensitive point of sale and delivery integration hardware if the building's surge protection is not adequate for a facility running this much simultaneous kitchen equipment. Extended hours also mean the building's emergency switching, required under AS/NZS 3000 wherever an unexpected hazard such as a kitchen fire risk needs power cut quickly, has to be clearly identified and accessible for whichever tenant is on shift at 11pm, not just during business hours when the building manager is on site.

Why it's Level 2 ASP work

Almost everything described above sits upstream of a standard domestic job. Sizing consumer mains and submains for several commercial kitchens, applying switchboard diversity correctly, splitting a shared supply into separately metered tenant circuits, and in many cases upgrading the connection itself, are all work that touches the point of supply and falls to a Level 2 Accredited Service Provider rather than a standard electrician. Getting the maximum demand calculation wrong on a multi tenant job does not just cause nuisance tripping, it can mean a defective installation that the distributor refuses to connect, or a defect notice landing on the landlord's desk after the fact.

A genuine Level 2 ASP can also carry out live connection work, service upgrades and metering changes without waiting on distributor crews, which matters on a fitout timeline where every week of delay is a tenant not trading. See our Level 2 electrician Sydney service page for what this accreditation actually covers.

How High Demand Electrical helps

High Demand Electrical is one of Sydney's most trusted Level 2 ASPs for exactly this kind of multi tenant commercial job. We start a ghost kitchen project with a proper maximum demand calculation across every proposed station, not a rough estimate from a floor plan, and we design the submain and tenant distribution boards so each operator gets genuinely dedicated, individually protected circuits from day one.

Our team handles the switchboard upgrade and power supply upgrade work as one coordinated project, including any three phase supply increase, tenant level metering and the RCD and wash down compliance work a commercial kitchen fitout demands. We are a licensed local team, not a call centre, servicing hospitality fitouts and commercial landlords across Sydney's West, South West and Sutherland Shire, and we work directly with builders, fitout managers and landlords to keep a multi tenant kitchen project moving without surprises at connection time.

Ghost Kitchen Electrical Requirements FAQs (Sydney)

How is maximum demand different for a ghost kitchen compared to one restaurant?

A single restaurant's maximum demand is based on one kitchen's known equipment. A ghost kitchen has to account for several independent stations potentially peaking together, using AS/NZS 3000's diversity methods rather than simply adding up every tenant's full connected load. See our guide to calculating maximum demand under AS3000 for the full method.

Can an existing single tenancy building be converted into a ghost kitchen facility?

Often, yes, but it almost always needs a switchboard upgrade and in many cases a three phase power upgrade, since the original supply was sized for one business rather than several simultaneous kitchens.

Who is responsible for each tenant's circuit faults in a shared kitchen building?

With correctly designed dedicated circuits, each tenant's own board and breakers isolate faults to their own station, so the landlord's building supply and other tenants are unaffected. This is a design outcome, not an assumption, and it needs to be built in during the fitout.

Does a ghost kitchen need its own emergency electrical shutdown?

Yes. AS/NZS 3000 requires emergency switching wherever an unexpected hazard, such as a kitchen fire risk, needs power cut quickly, and in a multi tenant building this needs to be clearly identifiable and accessible for whichever operator is trading at the time.

How long does a switchboard upgrade for a ghost kitchen facility take?

It depends on the scope and whether a distributor connection increase is involved, but a dedicated site assessment is the only reliable way to scope timing and cost for a multi tenant commercial job like this.

Ready to get your ghost kitchen or cloud kitchen facility's power properly assessed? Get a Switchboard Upgrade Quote from High Demand Electrical, or call 0402 559 777 to talk through your fitout. Every job needs a site assessment before scope or pricing can be confirmed.

Need Help Fast?

Choose your issue to get expert solutions, upfront pricing, and clear next steps—or speak with a local electrician today.
Emergency Electrician Near Me
Public Holiday Electrician
Weekend Electrician
After Hours Electrician
Emergency Consumer Mains
Cut Underground Cable
Underground Power Fault
Service Line Pulled Off House
Tree On Power Lines
Low Hanging Power Lines
Fallen Power Line
Power Pole Hit By Car
Leaning Power Pole
Fallen Power Pole
Power Surge Damage
Lightning Strike Damage
Storm Damage Meter Box
Storm Damage Switchboard
Flood Damage Electrical Repairs
Storm Damage Electrician
Lights Flickering
Fuse Keeps Blowing
Safety Switch Keeps Tripping
Circuit Breaker Keeps Tripping
Main Switch Won't Reset
Burnt Meter Box
Smoke Coming From Meter Box
Emergency Switchboard Repairs
Buzzing Switchboard
Smoke Coming From Switchboard
Sparking Switchboard
Burning Smell From Switchboard
Electrical Fault Finding
Power Restoration
Power Restored But No Power
Partial Power Loss
No Power to House
Power Outages

Follow Us On Our Social Media

Powering Your Needs with Expertise

If you’re looking for a reliable, experienced, and prompt electrician, look no further than High Demand Electrical. We cater to all your electrical needs, from routine maintenance to emergency repairs and complete system installations. Our skilled team is committed to providing professional service that ensures your electrical systems run smoothly. Whether it's a small task or a large project, give us a call today. Let us meet all your electrical demands with the quality and reliability you deserve.