Every switchboard upgrade, EV charger install and supply upgrade in NSW starts with the same question: what is the maximum demand of the installation? Get it wrong and you end up with nuisance tripping, an overloaded consumer main, or a knocked-back connection application. To make it easier, we've built a free maximum demand calculator that applies Table C1 of AS/NZS 3000:2018 and shows its working line by line. You'll find the calculator embedded at the bottom of this guide, ready to use — or open the full calculator page.
Key Takeaways
• Maximum demand is the peak current your installation realistically draws, in amps per phase — not the total of every appliance added together.
• AS/NZS 3000 Table C1 applies diversity factors per load group: 50% for cooking, 75% for air conditioning, 100% for storage hot water and EV chargers.
• An EV charger is counted at 100% with no diversity — a 7kW charger adds about 30A to one phase, which is why many installs trigger a supply upgrade.
• The result determines your main switch size, consumer mains and whether you need single-phase or three-phase power.
• Any change to your supply, metering or consumer mains is Level 2 ASP work under the NSW Service and Installation Rules.
What maximum demand actually means
Your home might have 25kW of appliances connected, but you'll never run every hotplate, heater and light at once. AS/NZS 3000 recognises this with diversity: each load group in Table C1 is counted at a percentage that reflects real-world use. The total per phase — after diversity — is your maximum demand, and it's the figure your electrician, your distributor and your switchboard all care about.
How to use the calculator: step by step
Step 1 — Pick your installation type
Choose house or individual unit for a single domestic installation, or block of living units if you're assessing common mains for a strata or multi-unit site. The unit-block mode uses columns 3–5 of Table C1, where allowances per unit shrink as the number of units grows.
Step 2 — Choose single-phase or three-phase
On three-phase you'll enter quantities per phase (Red / White / Blue). Spread your single-phase loads as evenly as you can — the calculator warns you if the phases are out of balance, because your maximum demand is set by the busiest phase.
Step 3 — Add your loads
Work through the house one load group at a time: lighting points (a double batten counts per lamp holder, a double power point counts as two socket points), the cooking range in kilowatts, storage hot water, air conditioners (use the maximum input amps from the nameplate, not the cooling kilowatts), pool equipment and any EV charger. Appliances 10A and under on plugs simply count as socket points — the calculator handles the rest.
Step 4 — Read the result
You'll see demand per phase, the highest phase, and the next standard main switch size. Open "Show the full working" to see exactly how each line was calculated — handy for apprentices studying for their capstone, and for homeowners who want to sanity-check a quote. You can print the result as a PDF or copy a summary.
A quick worked example
A typical three-bedroom Sydney home — 28 lighting points, 14 double power points, a 9kW range, a 3.6kW storage hot water system and a reverse-cycle air conditioner drawing 11.5A — comes out around 63A single-phase. Add a 7kW EV charger and it jumps past 90A: suddenly you're talking about a supply upgrade or three-phase, which is exactly the conversation we have with Sydney homeowners every week.
When to call a Level 2 electrician
The calculator is an estimating and learning tool — it doesn't replace an assessment by a licensed electrician, and it doesn't know what your existing consumer mains, switchboard or street supply can actually handle. If your calculated demand is over 63A per phase, you're adding an EV charger, ducted air conditioning or a pool, or you're planning a granny flat or unit development, get it verified before you buy equipment.
High Demand Electrical are licensed Level 2 ASP electricians in Sydney. We confirm maximum demand on site, upgrade switchboards and consumer mains from 63A single-phase to 400A three-phase, and lodge the paperwork with Ausgrid, Endeavour or Essential Energy for you. Call 0402 559 777 for a straight answer on what your project needs.
This guide is general information for the Australian market and refers to AS/NZS 3000:2018 Appendix C. It is not a substitute for advice from a licensed electrician about your specific installation.
Try the maximum demand calculator
Use the calculator below — no sign-up, no watermark. Print your result and bring it to us to confirm.
Powering Your Needs with Expertise
If you’re looking for a reliable, experienced, and prompt electrician, look no further than High Demand Electrical. We cater to all your electrical needs, from routine maintenance to emergency repairs and complete system installations. Our skilled team is committed to providing professional service that ensures your electrical systems run smoothly. Whether it's a small task or a large project, give us a call today. Let us meet all your electrical demands with the quality and reliability you deserve.