Asbestos Switchboards in NSW: Spot, Manage, Upgrade

If your home or building in NSW was wired before the late 1980s, the panel behind your fuses and meter may contain asbestos. Left alone and intact, it is low risk. Drilled, cut, cracked or removed the wrong way, it is not. The safe path is to leave it untouched, get a Level 2 electrician to assess the board, and have any asbestos-containing panel dealt with by the right licensed people before a switchboard or power supply upgrade starts. High Demand Electrical is a certified Level 2 electrical contractor in Sydney, and the electrical side of that job is what we do every day.

High Demand Electrical
Plan a safer switchboard upgrade
High Demand Electrical handles Level 2 switchboard upgrades in Sydney, with safety and NSW compliance central to the work.
Visit

TL;DR

  • Older switchboard backing boards (dark brown or black, stiff, fibrous, sometimes smelling of tar) can contain asbestos, and you cannot confirm it by looking.
  • Undamaged and undisturbed, the NSW Government classes asbestos-containing material as low risk. Damage, drilling or renovation changes that.
  • Do not drill, cut, sand or screw into the board. If it is cracked or crumbling, keep people away and call an emergency electrician.
  • Upgrades such as switchboard replacement or single phase to three phase need the asbestos question answered first.
  • Up to 10 m² of non-friable asbestos can be removed without a licence in NSW, but SafeWork NSW recommends a licensed professional for any amount.

Table of Contents

What an asbestos switchboard actually is

The asbestos is rarely in the metal box. It is in the backing board: the flat panel fixed to the wall or inside the box that carries fuses, links, circuit breakers, meters and other gear. The NSW Government describes these bituminous electrical backing boards as black or dark brown panels with a stiff, rough, fibrous or wood-like surface. They may smell like tar and may be stamped on the back with brand names such as Lebah, Zelemite, Miscolite or Ausbestos.

Safe Work Australia’s product guide adds that panels made from asbestos mixed with resin or coal tar pitch were usually dark brown or black with a rough finish, and that most were installed before 1990. Early to mid-20th-century fittings may also be Bakelite, often containing asbestos.

Two details matter for homeowners and property managers:

  • Friable dust can sit inside the box. The same guide notes that meter boxes fitted with these panels may contain friable asbestos dust or debris. Friable means it can crumble by hand and release fibres into the air.
  • A warning sticker may already be there. If the electricity network company has flagged a board as potentially containing asbestos, the NSW asbestos site says a sticker may be on the board or inside the meter box.

How to tell whether your board might contain asbestos

Start with age. The NSW asbestos site says that if a property was built or renovated before 1990 it probably has asbestos-containing materials somewhere. It also says you cannot tell if a material contains asbestos just by looking: confirmation needs testing by a licensed asbestos lab.

That gives you a practical checklist without touching anything:

  1. Check the age of the building and of the last switchboard work. Pre-1990 is the flag.
  2. Look at the visible panel (with the door opened only if it opens normally and the board is dry and intact). Dark brown or black, hard, fibrous, no plastic gloss.
  3. Look for stickers or stamps from the network company or manufacturer.
  4. Check the asbestos register if you manage a commercial property. The NSW site says commercial properties built before 2004 must have an Asbestos Register listing suspected or assumed asbestos, where it is and its condition.
  5. Apply the golden rule: if it might be asbestos, treat it as asbestos until a licensed asbestos assessor says otherwise.

A Level 2 electrician looks at switchboards daily and can recognise a likely backing board on sight, but the legal and safe answer is still assume first, test second. Never scrape, drill or take a sample yourself.

Is it dangerous if it just sits there?

The NSW Government says asbestos-containing material in good condition and unlikely to be damaged is low risk. It also says there is no known safe level of exposure to asbestos. Put together, that means the board is not an emergency simply because it exists, but it must not be disturbed.

Safe Work Australia warns that drilling, cutting, sanding or water blasting these panels may release asbestos fibres. That is exactly what happens on a standard switchboard upgrade: new circuit breakers are screwed in, cables are cut and fed through, old gear is pulled off. An upgrade done without identifying the backing board first is how a low-risk board becomes a high-risk one.

If the board is damaged or you need urgent electrical work

A cracked, burnt, wet or crumbling panel changes the picture. Here is what to do:

  • Make the area off-limits. Keep children, pets and visitors away from the board. Do not sweep, vacuum or brush away debris, and do not touch the panel.
  • Do not carry on with DIY or a quick fix. No patching, no new screws, no cutting.
  • If there is burning, sparking, a hot smell or buzzing, treat it as an electrical emergency. Turn off the main switch only if you can reach it safely and the area is dry, then call 000 if there is fire or immediate danger.
  • Call an emergency Level 2 electrician to make the supply safe. Our emergency electricians are available 24/7, and we offer a 10-minute callback guarantee. Tell us up front that the board is old and may contain asbestos so the job is planned around it.
  • Where fibres may have been released, arrange a licensed asbestos assessor, since that is who decides what testing, clearance and removal are needed.

For more on faults at the board itself, see our guide to emergency switchboard repair in Sydney.

Who is allowed to work on it in NSW

There are two separate sets of rules: asbestos rules and electrical rules. A compliant job satisfies both.

The asbestos side

Under Australian work health and safety laws, licensed asbestos removalists come in two classes, as explained in Safe Work Australia’s guide for electricians: Class A can remove all types of asbestos, and Class B only non-friable asbestos. A business can remove no more than 10 m² of non-friable asbestos without a licence outside the ACT. The same booklet says work that disturbs or is likely to disturb asbestos needs a Safe Work Method Statement, because it is high-risk construction work.

SafeWork NSW’s fact sheet states that up to 10 m² of non-friable asbestos can legally be removed without a licence, but it recommends a licensed professional for any amount. Any amount of friable asbestos must be removed by a Class A licensed removalist. A switchboard panel with crumbling or dusty material, or a board whose condition you cannot confirm, belongs with a licensed professional.

Electricians are also covered. The Safe Work Australia booklet says an electrician must check for asbestos before starting: ask to see the asbestos register, have a sample tested by an asbestos professional, or assume the material is asbestos and take precautions. Anyone doing work that involves asbestos, including cutting holes in asbestos sheeting for cables, must be trained in identification, safe handling and control measures, use equipment that captures or suppresses airborne fibres, and follow safe decontamination and disposal methods.

Electrician asbestos checks and safe-work controls

Disposal has its own rules. The NSW EPA’s Asbestos and Waste Tyres Guidelines (Version 3, effective from 28 February 2024) set out the requirements for transporting and receiving asbestos waste. Asbestos from a switchboard cannot go in a household bin.

The electrical side

In NSW, work on the supply side of your property, such as consumer mains, the connection to the network and service equipment, is done by a Level 2 Accredited Service Provider (ASP) authorised by the network. That is the work we are certified for. Replacing a backing board with a modern switchboard, rewiring the circuits to it and reconnecting the supply is the electrical portion of an asbestos switchboard job, and it needs to be done to NSW standards with the compliance paperwork completed.

How an asbestos board is handled during an upgrade

A properly sequenced job looks like this:

Stage What happens Who it involves
1. Assessment Inspect the board and supply arrangements; flag a likely asbestos backing board; stop short of disturbing it Level 2 electrician
2. Confirmation Test the material or treat it as asbestos; check the asbestos register for commercial sites Licensed asbestos lab or assessor
3. Planning Decide the scope: board only, or board plus power supply upgrade; agree sequencing and outage times You, electrician, removalist
4. Removal Safe removal and disposal of the asbestos-containing panel Licensed asbestos removalist (Class A or B as required)
5. Electrical works New switchboard, circuit protection, reconnection of supply, testing Level 2 electrician
6. Compliance Certification of the completed electrical work and any network paperwork Level 2 electrician

The order matters. The electrical work must not begin on top of an asbestos panel, and the removal must not leave you without a safe, compliant supply for longer than necessary. Planning the two together, with the electrician aware of the asbestos from the first inspection, avoids the most common failure: an upgrade booked at a set date that cannot go ahead because the asbestos question was never asked.

Our page on asbestos switchboard backboards in Sydney and the law goes deeper on the legal position.

Single phase to three phase: why asbestos comes up

Moving from single phase to three phase power, for an EV charger, a larger air conditioning load, a workshop or a granny flat, usually means a new switchboard and new consumer mains or service connection. Those older homes with the original wiring are the ones most likely to still carry a pre-1990 backing board. The upgrade almost always touches the board, so the asbestos question has to be settled in the planning stage, not on the day.

If you are considering a three phase upgrade, start with our power supply upgrades page. Because the work includes Level 2 tasks, we offer free site inspections for Level 2 work, so the board’s condition and the scope can be assessed before you commit.

Who this matters to most

Homeowners and buyers of older houses. Before renovating, adding air conditioning or charging an EV, know what is behind the meter box door. A switchboard upgrade is also the moment to remove a known hazard properly.

Property managers and strata. Commercial buildings from before 2004 need an asbestos register, and a switchboard room often holds suspect panels. Keeping the register current and matched to electrical work orders protects contractors and tenants. Our guide to commercial switchboard requirements in NSW covers the electrical side.

Contractors. If your crew will be working near a board, the booklet’s rule is plain: check the register, test, or assume asbestos. Cutting into the panel without training is not an option.

Seniors. Many older homes are lived in by their original owners, with the original board. We offer special discounts for seniors, so ask when you book an inspection.

Our approach to asbestos switchboards

We are asked all the time whether an old board is “safe to leave”. The honest answer is that an undisturbed board in good condition is low risk, and the risk arrives when someone starts work on it without knowing what it is.

That is why we treat the first visit as an assessment, not a quote for a quick swap. As a Level 2 ASP contractor we are accredited for the supply side work that a modern switchboard and a three phase upgrade involve, and our electricians are experienced in switchboard upgrades to NSW standards. Our free site inspection for Level 2 work gives you the scope in front of you before anything is touched.

If you suspect asbestos, tell us at the first call. We will plan the electrical works around the safe removal of the panel by licensed people, so the home or building is not left without a safe supply longer than it has to be.

Christopher

Getting your board assessed

If you have an older board, a renovation coming up, or a three phase upgrade planned, our switchboard upgrades service is the place to begin. We are a certified Level 2 contractor, triple ISO certified, with over 300 five-star reviews, and we serve residential, commercial and strata clients across Sydney. Book a free Level 2 site inspection and we will tell you what the board needs, in what order, before any work is priced.

High Demand Electrical

For a broader check of the whole installation, our electrical safety inspections cover more than the board.

FAQ

Can I tell if my switchboard has asbestos just by looking?

No. The NSW asbestos site says you cannot confirm asbestos by sight; it needs testing by a licensed lab. Dark brown or black, stiff, fibrous panels in pre-1990 buildings are a strong warning sign, so treat them as asbestos until tested.

Is it safe to live with an asbestos switchboard?

The NSW Government says asbestos-containing material in good condition and unlikely to be damaged is low risk. Do not drill, cut or screw into it, and call a Level 2 electrician if the panel is cracked, broken or exposed to heat or water.

Can I remove an asbestos switchboard backing board myself?

SafeWork NSW recommends a licensed professional for any amount of asbestos, and any friable asbestos must be removed by a Class A licensed removalist. A switchboard also carries live supply wiring, so the panel and the electrical work should be handled by licensed professionals.

Do I need asbestos dealt with before a three phase upgrade?

If the board is, or may be, an asbestos backing board, yes. The upgrade involves cutting, drilling and removing gear on that panel, which is exactly what can release fibres. Settle the asbestos question first, then schedule the electrical work.

Who do I call if the board is damaged out of hours?

Call 000 for fire or immediate danger. For a fault or damaged board with no fire, call an emergency Level 2 electrician, and say that the board may contain asbestos so the response is planned for it.

Sources

Need Help Fast?

Choose your issue to get expert solutions, upfront pricing, and clear next steps—or speak with a local electrician today.
Emergency Electrician Near Me
Public Holiday Electrician
Weekend Electrician
After Hours Electrician
Emergency Consumer Mains
Cut Underground Cable
Underground Power Fault
Service Line Pulled Off House
Tree On Power Lines
Low Hanging Power Lines
Fallen Power Line
Power Pole Hit By Car
Leaning Power Pole
Fallen Power Pole
Power Surge Damage
Lightning Strike Damage
Storm Damage Meter Box
Storm Damage Switchboard
Flood Damage Electrical Repairs
Storm Damage Electrician
Lights Flickering
Fuse Keeps Blowing
Safety Switch Keeps Tripping
Circuit Breaker Keeps Tripping
Main Switch Won't Reset
Burnt Meter Box
Smoke Coming From Meter Box
Emergency Switchboard Repairs
Buzzing Switchboard
Smoke Coming From Switchboard
Sparking Switchboard
Burning Smell From Switchboard
Electrical Fault Finding
Power Restoration
Power Restored But No Power
Partial Power Loss
No Power to House
Power Outages

Follow Us On Our Social Media

Powering Your Needs with Expertise

If you’re looking for a reliable, experienced, and prompt electrician, look no further than High Demand Electrical. We cater to all your electrical needs, from routine maintenance to emergency repairs and complete system installations. Our skilled team is committed to providing professional service that ensures your electrical systems run smoothly. Whether it's a small task or a large project, give us a call today. Let us meet all your electrical demands with the quality and reliability you deserve.