Overhead Service Mains Installation
Overhead Service Mains Installation Sydney
High Demand Electrical are your trusted Level 2 accredited service provider in Sydney. Specialising in robust and efficient overhead service mains installations, we ensure that homes and businesses enjoy uninterrupted and reliable power supply. Understanding the critical nature of electrical distribution, our team is committed to delivering superior service that meets the diverse needs of our clients.
Contact US
What Are Overhead Service Mains?
Overhead service mains are essential components of electrical distribution systems, responsible for transmitting power from utility poles directly to your property's electrical system. Unlike underground mains, which are buried, overhead mains are installed above ground on poles and are visible throughout neighbourhoods and along streets. The primary advantage of overhead mains is their accessibility for maintenance and lower installation costs compared to underground systems.
Cost-Effectiveness
Ease of Maintenance
Reliability
Increased Power Requirements
Environmental Damage
Property Renovations
Our Overhead Installation Services
We offer comprehensive installation services for both single-phase and three-phase overhead service mains. Catering to residential and commercial clients, we provide custom solutions designed to meet specific energy needs. Whether upgrading existing lines or installing new ones, our skilled technicians ensure that every project is executed with precision and tailored to optimise electrical distribution according to the layout and requirements of your property.
Single-Phase or Three-Phase Overhead Mains
We install and upgrade both single-phase and three-phase overhead service mains for residential and commercial clients, with custom solutions designed around your property's energy needs.
Where Your Overhead Mains Connect to Your Property
The point of attachment is where the overhead service line connects to your property — mounted on the fascia under the gutter, or on a private power pole where a fascia connection isn't suitable.
Fascia Bracket
Rafter Bracket
Clearance Compliance
Recent Overhead Service Mains Jobs
Real overhead service mains jobs completed by our Level 2 ASP team. Tap a job to see why we were called, what we did and the result.

Overhead Service & Meter Relocation in Marrickville, NSW
A Marrickville property got a new fascia bracket, 11m of new single-phase overhead service lines and a relocated meter, with the service route documented in 2.5 hours.

New fascia bracket, 11m of single-phase overheads and a relocated meter in one visit
A property in Marrickville, NSW needed a new fascia bracket installed, single-phase overhead service lines replaced, and the meter relocated to a new board. A licensed Level 2 ASP electrician in Sydney was needed.
- Mounted the new fascia bracket securely using timber and threaded rod as a packer
- Disconnected old 6mm overhead lines and installed 11m of new single-phase overheads
- Relocated the meter to the new board and sealed and labelled
- Created the service route. Works complete in 2.5 hours
New overhead service lines were installed, the meter relocated, and the service route documented in a single visit. The property was left neat, compliant, and ready for metering finalisation.

Three-Phase Power Upgrade & New Meter Installation in Petersham, NSW
A Petersham home was upgraded from single to three-phase power in a single day, with new overhead lines, an upgraded switchboard and a new meter, ready for solar.

Single to three-phase upgrade with a new meter and switchboard so the home was ready for solar
A homeowner in Petersham, NSW wanted to install a solar system but their property wasn't set up for it. To make it happen, the entire power supply needed upgrading from single-phase to three-phase — including a new meter, new connections at the pole, and a fully upgraded switchboard.
- Ran new three-phase overhead power lines from the pole to the property
- Upgraded the fuses, main switch, and switchboard to handle three-phase power
- Supplied and installed a brand new three-phase electricity meter
- Left the board fully tested and ready for the solar system to be connected
The property was upgraded from single-phase to three-phase power in a single day. The new meter was installed on schedule and the homeowner was ready to proceed with their solar installation without any further electrical works needed.

Single to Three-Phase Supply Upgrade in Lewisham, NSW
A Lewisham property moved from single-phase to three-phase supply, with 20m of new overhead service mains, three service fuses and a new three-phase meter.

Upgraded to three-phase supply with new overhead mains, service fuses and a new meter
A Lewisham property was upgrading from single-phase to three-phase supply, which meant a network application, a new overhead service and a new three-phase meter. Upgrading the service and the metering is work only a licensed Level 2 ASP electrician in Sydney can carry out.
- Disconnected the existing single-phase supply, installed a new point-of-attachment hook and drilled through the fascia to install conduit for the consumer mains entry
- Supplied and installed 20m of three-phase overhead service mains, connected at the point of attachment and at the network pole, trimming surrounding branches for clearance
- Installed three service fuses, terminated the consumer mains and installed and wired the new electricity meter
- Completed electrical testing, tagged and secured all connections and reinstated supply
The property is now on three-phase supply with new overhead service mains, service fuses and a three-phase meter, all tested and energised. Vegetation around the service was trimmed back to maintain proper clearance.

Switchboard Upgrade & Overhead Mains Replacement in Russell Lea, NSW
A Russell Lea home got a new three-phase switchboard with RCBOs on every circuit, 40m of new consumer mains and new overhead service mains from a repositioned point of attachment.

New three-phase switchboard, consumer mains and overhead service mains
A Russell Lea home needed its point of attachment repositioned, a new three-phase switchboard with RCBOs on every final subcircuit, new consumer mains and new overhead service mains. Point-of-attachment and overhead service work requires a licensed Level 2 ASP electrician in Sydney.
- Installed a new B&R N20 switchboard with nine 7m 2.5mm² TPS tails, one 8m 6mm² tail and a large roof-space junction box, terminating all ten subcircuits
- Installed a new earth stake with 3m of 6mm² earthing cable, along with circuit breakers, surge protection and service protection devices
- Ran 40m of 16mm² XLPE consumer mains and installed a new service neutral
- Removed the old sub-board, redundant cabling and old overhead service mains, then installed new three-phase overhead service mains — with a generator supplied free of charge for the day to keep the home powered
The property is now on a new three-phase board with every subcircuit protected, surge protection fitted and fresh overhead mains from the repositioned point of attachment. The homeowner kept power throughout the works thanks to the generator we supplied at no charge.

Private Pole & Three-Phase Service After a Cable Fire in Galston, NSW
After the main powerline caught fire, a Galston property got a new private pole, three-phase overhead service, underground mains and 100A main switch.

Connection rebuilt from the pole down with a new private pole and three-phase service
The main powerline running from the pole to a Galston property caught fire, taking out the connection entirely. Rebuilding a service from the pole down is Level 2 ASP work, so a licensed Level 2 ASP in Sydney was needed to put the whole connection back.
- Installed a new private power pole and three-phase overhead service
- Trenched and ran new underground consumer mains and conduits
- Installed a new 100A three-phase main switch, back-wired fuses, switchboard wiring and earthing
- Backfilled, tested and commissioned the installation
The property is back on a new three-phase connection built from the pole down, tested and commissioned. The neutral meter tail will be completed by the metering technician when the new smart meter is fitted.

Switchboard, Consumer Mains & Overhead Service Renewal in Glebe, NSW
A Glebe property's ageing switchboard, consumer mains and overhead service were renewed, with a new earth stake restoring the earth fault return path.

New switchboard, consumer mains, overhead service and earth stake installed
A property in Glebe had an ageing main switchboard, deteriorated overhead consumer mains and no sound local earth fault return path. Renewing the service mains and the point of attachment is network-side work, so a licensed Level 2 ASP in Sydney was required to carry out the full upgrade.
- Removed the existing main switchboard and consumer mains, then installed a new main switchboard and panel with new consumer mains run in 40mm HD conduit to the point of attachment
- Replaced the point of attachment hook and installed new overhead service mains from the network pole
- Installed a new earth stake to restore the earth fault return path
- Extended the subcircuits and connected them to RCBO protection, then re-energised, tested and tagged the installation
The property is now supplied through new overhead service mains and consumer mains into a new switchboard with RCBO protection throughout. The earthing system was restored, and the installation was tested and tagged before supply was returned.

Underground-to-Overhead Service Conversion in Gerroa, NSW
A Gerroa property was taken off its temporary pole with a UGOH kit installed up the street pole and the supply moved to the new switchboard.

UGOH kit installed up the street pole and temporary supply moved to the new switchboard
A Gerroa property was being taken off its temporary power pole and connected directly to the street pole, feeding a newly installed switchboard. Converting an underground cable up a pole to an overhead connection is Level 2 ASP work and has to be carried out by a licensed Level 2 ASP electrician.
- Cut back the conduit below ground level and installed 40mm heavy-duty grey hose over the existing cable
- Installed the UGOH kit and saddles up the pole
- Prepared the cable with heatshrink and made off the IPC connections
- Relocated the existing temporary power supply to the new switchboard location
- Completed additional switchboard and earthing works at the customer's request
The property is now fed by a direct underground-to-overhead connection at the street pole, running into the new switchboard, with the temporary pole arrangement retired. The three-phase meter application is the remaining step.

Three-Phase Overhead Service & Underground Mains in St Ives, NSW
A St Ives property was moved from single to three-phase with a new overhead service, new pole and 15m of underground mains run to the switchboard.

New three-phase overhead service, private pole and underground mains connected
A property in St Ives was moving from a single-phase supply to three-phase, which meant a new overhead service from the street pole and new underground consumer mains run back to the switchboard. Disconnecting the existing supply, establishing a new point of attachment and reconnecting the service is network-side work, so a licensed Level 2 ASP in Sydney was required to carry it out.
- Marked out and cut approximately 15m of trenching through the driveway, jackhammering through solid rock to reach the required 300mm depth
- Core drilled and installed a new pole, then ran and connected 25mm² 4-core cabling up it
- Ran 25mm² aluminium overhead mains across the road, trimming a large section of tree for clearance
- Ran the cabling beneath the deck and through the slab to the switchboard, installed the new panel and surround, and safely capped off the old shared supply
The property is now running on a new three-phase supply, with the overhead service, new pole and underground mains all connected, tested and commissioned. The old supply was removed and safely capped off, and a new power point was installed at the board.

Three-Phase Overhead Mains Upgrade in Thornleigh, NSW
New three-phase overhead service mains were installed back to the network asset pole at a Thornleigh property, then energised, tested and labelled.

New three-phase overhead mains connected, terminated and tested
A Thornleigh property needed its overhead supply disconnected and reconnected as part of a three-phase mains upgrade, with the service run back to the network asset pole. Overhead service mains are Level 2 work, so a licensed Level 2 ASP electrician in Sydney was required.
- Installed new three-phase overhead service mains and connected to the existing asset pole
- Prepared and terminated the four-core cable at the point of attachment
- Energised the supply and completed electrical testing
- Installed the required tags and labels before leaving site
The property is now on new three-phase overhead service mains, correctly terminated at the point of attachment and fully tested. All connections were tagged and labelled before the supply was handed back.
Our Energy Providers
Authorised by Sydney's major networks







Compliant, Reliable Overhead Power
team
quotes
storm damage
Get a free overhead mains assessment — sized right, done once.
Safe & Compliant Installation Services
Safety is paramount in all our installations. High Demand Electrical adheres strictly to the Australian Standards AS/NZS 3000, the Service and Installation Rules of NSW, and specific network operator rules, ensuring that every project complies with local regulations. Our team takes every precaution necessary to safeguard both our workers and your property during the installation process, guaranteeing a safe and compliant setup.
Common Reasons for Upgrading Overhead Service Mains
Clients often require upgrades or new installations due to:
- Increased Power Requirements
Upgrading equipment or expanding facilities can necessitate higher capacity overhead mains. - Environmental Damage
Exposure to severe weather can impair existing infrastructure, requiring comprehensive assessments and replacements. - Property Renovations
Changes in property layout or function often lead to modifications in the electrical system to support new demands.

Overhead vs Underground — Which Is Right for You?
Overhead service mains are generally the more affordable, accessible option, running above ground from a utility pole to your point of attachment. They're easier and cheaper to inspect and repair than buried alternatives, and less prone to ground-level issues like digging damage or flooding — though in low-clearance areas near trees or structures, a Tiger Tail safety cover may be recommended.
Other Services We Offer

Authorised Level 2 Electricians
High Demand Electrical is proud to be recognised as an authorised Level 2 service provider in Sydney. Level 2 accreditation signifies our team's advanced qualifications and the authority to handle specific types of electrical work that go beyond standard residential or commercial electric services. This includes complex installations, repairs, and maintenance that require direct interaction with the electricity network.
As Level 2 accredited electricians, we have the specialised skills necessary to perform overhead service mains installations, maintenance, and upgrades. This authorisation allows us to work directly with the utility's assets—such as connecting new service lines to the network, upgrading existing connections to meet enhanced power requirements, and safely handling live or energised lines. Our team's capabilities ensure that all aspects of your overhead service mains are managed professionally, from initial planning and installation to ongoing maintenance.
Why Choose Overhead Service Mains?
Opting for overhead electrical service presents several benefits:
- Cost-Effectiveness
Overhead installations are generally less expensive than underground alternatives due to reduced labour and material costs. - Ease of Maintenance
The accessibility of overhead systems simplifies inspections and repairs, reducing downtime and maintenance costs. - Reliability and Adaptability
Overhead mains are less susceptible to disruptions caused by ground-level issues such as digging or flooding, ensuring a consistent power supply.
Don’t Wait—Secure Your Power Today!
Ready to take action? Getting started with us is quick and easy. Reach out to High Demand Electrical to discuss your needs and receive a fast, accurate quote. Whether you’re facing an urgent power issue, planning a property upgrade, or setting up new construction, our team of certified Level 2 electricians is equipped to handle your project with the utmost professionalism.
Contact US
Western Sydney
South-West Sydney
St. George & Canterbury-Bankstown
Sutherland Shire
Get Your Overhead Service Mains Installation Quote Today
High Demand Electrical - Overhead Service Mains Installation
FAQs
The duration for installing or upgrading overhead service mains can vary depending on several factors such as the complexity of the project, the length of the mains to be installed, the condition of existing infrastructure, and weather conditions. Typically, a straightforward installation or upgrade could take anywhere from a few hours to a couple of days.
You might consider an overhead service mains upgrade if you experience any of the following:
- Frequent Power Outages
If you are experiencing regular interruptions in your power supply that are not related to broader electrical grid issues, it might be a sign that your current service mains are inadequate. - Addition of Major Appliances
Installing appliances that consume a significant amount of power, such as HVAC systems, electric vehicle charging stations, or large manufacturing equipment, may require more power than your current setup can safely supply. - Renovations or Expansions
Any renovation or expansion that increases the area of your property or adds significant electrical loads might necessitate an upgrade to ensure that your electrical system can handle the increased demand safely. - Signs of Wear and Tear
Visible wear or damage to cables, frequent tripping of circuit breakers, or issues with power quality (like flickering lights) can also indicate that your current system might need an upgrade.
Overhead service mains run above ground from a utility pole to your property's point of attachment, generally costing less to install and easier to inspect and repair. Underground service mains are buried and better protected from storm damage, but involve trenching and typically cost more.
The point of attachment is where the overhead service line connects to your property, typically mounted on the fascia under the gutter or on a private power pole where a fascia connection isn't suitable. It must meet minimum clearance heights required by Australian Standards and network operator rules.
Overhead installation is generally the more affordable option compared to underground, with cost depending on cable length, single vs three-phase requirements, point of attachment work, and site access. A site assessment gives the most accurate figure for your property.
Where an overhead run has low clearance near trees or structures, a Tiger Tail safety cover may be required or recommended to reduce fire and safety risk. We can assess whether your overhead mains need this protection.
Testimonials
Our Partners



Powering Your Needs with Expertise
If you’re looking for a reliable, experienced, and prompt electrician, look no further than High Demand Electrical. We cater to all your electrical needs, from routine maintenance to emergency repairs and complete system installations. Our skilled team is committed to providing professional service that ensures your electrical systems run smoothly. Whether it's a small task or a large project, give us a call today. Let us meet all your electrical demands with the quality and reliability you deserve.