Need 3 phase charging at home or work in Sutherland Shire? Our Level 2 electricians install compliant 22kW EV chargers across Sutherland Shire and the wider the Sutherland Shire, with tidy workmanship and upfront pricing.
Faster Charging With 3 Phase Power
With 22kW 3 phase charging, drivers in Sutherland Shire can add hundreds of kilometres of range per hour. It's ideal for fleets, workplaces and busy families who can't afford to wait overnight.

Up to 3× Faster Charging At Home
Single Phase
Three Phase
Our Step-by-Step Installation
Every Sutherland Shire job follows the same careful process: inspect, quote, install on a dedicated 3 phase circuit, then test and hand over with a compliance certificate. No surprises, no shortcuts.

The Right Setup for Your Property
Businesses and households across the Sutherland Shire rely on us for charging that's safe, fast and built to last. We use quality hardware and back every Sutherland Shire install with certified workmanship.
22kW Fast Charging
Up to 3× faster than single phase — charge a larger EV in a fraction of the time.
Switchboard Protection
A dedicated circuit balances the load so your board and supply aren't strained.
Full RCD Safety
Dedicated RCD and earth-leakage protection to AS/NZS 3000 for safe charging.
Future-Proof
Ready for a second EV, solar integration and rising household demand.
How Our 3-Phase Install Step by Step
Annual booking
Licensed Assessment
Report & Plan
Report & Plan

Trusted EV Specialists Near You
Our accredited electricians know the Sutherland Shire well and arrive ready to install. Friendly service, tidy work and clear pricing on every Sutherland Shire 3 phase EV charger job.
Our Energy Providers
Authorised by Sydney's major networks







Services We Offer
High Demand Electrical - 3 Phase EV Charger Installation
FAQs
Do I need 3 phase power for an EV charger in Sutherland Shire?
Not always, but it's worth it. A 3 phase supply allows up to 22kW charging versus about 7kW on single phase. We'll check what your Sutherland Shire property has and recommend the best option.
How much does a 3 phase EV charger installation cost in Sutherland Shire?
Cost depends on your switchboard, the cable run and whether a supply upgrade is needed. We provide a free, no-obligation quote for every Sutherland Shire job before any work begins.
Do I need a Level 2 electrician for the installation?
Yes - any work involving the network connection or metering must be done by a Level 2 Accredited Service Provider. High Demand Electrical is fully accredited and services Sutherland Shire and the Sutherland Shire.
How long does a 3 phase EV charger install take in Sutherland Shire?
Most installations take from a few hours to a day, depending on cabling distance and any switchboard work required. We'll give you a clear timeframe with your quote.
Can you upgrade my single phase supply to 3 phase in Sutherland Shire?
Yes. As Level 2 ASPs we can arrange and complete a single-to-three phase upgrade with your network provider, then install your 22kW charger - all handled for you in Sutherland Shire.
Our Partners



Powering Your Needs with Expertise
If you’re looking for a reliable, experienced, and prompt electrician, look no further than High Demand Electrical. We cater to all your electrical needs, from routine maintenance to emergency repairs and complete system installations. Our skilled team is committed to providing professional service that ensures your electrical systems run smoothly. Whether it's a small task or a large project, give us a call today. Let us meet all your electrical demands with the quality and reliability you deserve.


