3 Phase EV Charger Installation Lidcombe

High Demand Electrical provides professional 3 phase EV charger installations throughout Lidcombe. As licensed Level 2 ASPs serving Western Sydney, we install 22kW chargers that cut your charge times dramatically.

Over 300 - 5 star reviews!
Get Your Free Instant Quote Now

We promise to get back to you within 10 minutes

Max file size 10MB.
Uploading...
fileuploaded.jpg
Upload failed. Max size for files is 10 MB.
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.

Why Lidcombe Drivers Choose 3 Phase

If your Lidcombe property already has 3 phase power, you can unlock 22kW charging without long waits. It's the smart choice for larger homes, dual-EV households and commercial sites across Western Sydney.

schedule a service
ev charging at home

Up to 3× Faster Charging At Home

Three-phase power lets your charger draw far more, so your EV is ready sooner.

Single Phase

~7kW
Around 40km of range per hour — fine for overnight top-ups on a smaller EV.

Three Phase

Up to 22kW
Around 120km of range per hour — ideal for larger homes, dual-EV households and commercial sites.
Why Homes Need Regular Servicing

How We Install in Lidcombe

Our Lidcombe installs begin with checking your switchboard and available phases. We then run the cabling, install a dedicated circuit with RCD protection, and commission the charger - leaving everything clean and certified.

Electric vehicle charging
Expertise You Can Count On

Benefits for Lidcombe Properties

A correctly installed 3 phase charger protects your switchboard, reduces strain on your supply and keeps your Lidcombe property ready for the next EV. It's an investment that pays off every day.

bolt

22kW Fast Charging

Up to 3× faster than single phase — charge a larger EV in a fraction of the time.

sort

Switchboard Protection

A dedicated circuit balances the load so your board and supply aren't strained.

verified_user

Full RCD Safety

Dedicated RCD and earth-leakage protection to AS/NZS 3000 for safe charging.

home

Future-Proof

Ready for a second EV, solar integration and rising household demand.

Simple, Scheduled, Stress-Free

How Our 3-Phase Install Step by Step

1

Annual booking

We confirm your available phases and switchboard capacity, and recommend the right charger.
2

Licensed Assessment

A transparent, upfront price including any cabling, RCD circuit or supply upgrade needed.
3

Report & Plan

We run the cabling and install a dedicated, RCD-protected 22kW circuit — neat and tidy.
4

Report & Plan

We test, commission and certify the charger, and walk you through using it.
After-Hours-Level-2-24_7
Stay Ahead with Proactive Care

Level 2 Electricians Serving Lidcombe

As Level 2 ASPs, our team completes service and metering work that standard electricians aren't licensed for - making us a one-stop choice for Lidcombe EV charger installations.

Fully Licensed

Our Energy Providers

Authorised by Sydney's major networks

Nearby Coverage Areas

Do We Service Your Area?

Type your suburb below to check instantly. We're across Greater Sydney.

    Can't find your suburb? Give us a call — we may still be able to help.
    Call 0402 559 777
    Find Us. Call Us.

    High Demand Electrical - 3 Phase EV Charger Installation

    home
    Address
    Level 36/1 Macquarie Pl, Sydney NSW 2000, Australia
    phone
    MAil
    timer
    Hours
    Open 24 hours
    Frequently Asked Questions

    FAQs

    Do I need 3 phase power for an EV charger in Lidcombe?

    Not always, but it's worth it. A 3 phase supply allows up to 22kW charging versus about 7kW on single phase. We'll check what your Lidcombe property has and recommend the best option.

    How much does a 3 phase EV charger installation cost in Lidcombe?

    Cost depends on your switchboard, the cable run and whether a supply upgrade is needed. We provide a free, no-obligation quote for every Lidcombe job before any work begins.

    Do I need a Level 2 electrician for the installation?

    Yes - any work involving the network connection or metering must be done by a Level 2 Accredited Service Provider. High Demand Electrical is fully accredited and services Lidcombe and Western Sydney.

    How long does a 3 phase EV charger install take in Lidcombe?

    Most installations take from a few hours to a day, depending on cabling distance and any switchboard work required. We'll give you a clear timeframe with your quote.

    Can you upgrade my single phase supply to 3 phase in Lidcombe?

    Yes. As Level 2 ASPs we can arrange and complete a single-to-three phase upgrade with your network provider, then install your 22kW charger - all handled for you in Lidcombe.

    Our Partners

    Powering Your Needs with Expertise

    If you’re looking for a reliable, experienced, and prompt electrician, look no further than High Demand Electrical. We cater to all your electrical needs, from routine maintenance to emergency repairs and complete system installations. Our skilled team is committed to providing professional service that ensures your electrical systems run smoothly. Whether it's a small task or a large project, give us a call today. Let us meet all your electrical demands with the quality and reliability you deserve.